Rogz Barbwire Long Dog Leash
Out of stock
SKU
301611
A wide range of cool graphic ribbons are stitched onto high grade webbing, ensuring your dog sports the latest and greatest.
JellyBean
HL01
SMALL
Yorkie, Pom, Maltese, Miniature Poodle, Chihuahua
Scooter
HL+HLL12
MEDIUM
Pug, Scotty, Jack Russel, Maltese Poodle, Terrier
Beach Bum
HL+HLL03
LARGE
Dalmation, Spaniel, Doberman, Boxer
Armed Response
HL+HLL02
X-LARGE
Rottweiler, Bouvier, Ridgeback, Labrador
Special Agent
HL04
XX-LARGE
German Shephard, Bulldog, Bouvier, St. Bernard
A wide range of cool graphic ribbons are stitched onto high grade webbing, ensuring your dog sports the latest and greatest.
Custom designed die cast ring (no welding). Electroplated chrome for a tarnish free finish.
SPECIFICATIONS
Acetyl Plastic Components, Zinc DieCast Components, Reflective Stitching, Nylon Webbing
Dimensions
| Size | Width of Webbing | Length | |
| JellyBean | SMALL | 1.1 cm | 3/8" | 1.8m | 71" |
| Scooter | MEDIUM | 1.6 cm | 5/8" | 1.8m | 71" |
| Beach Bum | LARGE | 2 cm | 3/4" | 1.8m | 71" |
| Armed Response | X-LARGE | 2.5 cm | 1" | 1.8m | 71" |
| Special Agent | XX-LARGE | 4 cm | 1 5/8" | 0,5m I 20" |
| Price | AED : 45.00 |
|---|---|
| Feed stock status | No |
| New | No |
| Is Sample Product | No |
| Mobile Instock | No |
| Subscription | No |
| Best Sellers | No |
| Introductory Offer | No |
| Custom URL | https://www.petsdelight.com/rogz-barbwire-long-lead |
| Brand | Rogz |
| Feature/Action | NA |
| Flavour/Main Ingredient | NA |
| Health | NA |
| Nutritional | NA |
| Type | Dog Leashes |
| Stage | Stage |
Write Your Own Review



